- What is an estimating? Why should prepare before construction work? Describe the data required for the preparation of an estimate. [1+1+4] (2082 Bhadra, Q.1)
The third part of this question also belongs to Section 1.3.
- Compare estimated cost and actual cost. Write down the unit of measurement and unit of payment for following item of works.
- i) R.C. sunshade with specified width and height
- ii) Thickness specified shutter of doors and windows
- iii) Iron Grills
- iv) Asbestos cement sheet in roofs
[3+2] (2081 Baishakh, Q.1)The second part of this question also belongs to Section 1.2.
- a) What is purpose of preparing detail estimate before construction work?
- b) Estimated cost is never equal to the actual cost of a project. Give your opinion.
[2+3] (2080 Bhadra, Q.1)- What is estimating and costing? Explain the principle of units. [2+3] (2080 Baishakh, Q.1)
- Explain that estimated cost is never the actual cost. What are the data required for estimating? [3+2] (2078 Bhadra, Q.1)
The second part of this question also belongs to Section 1.3.
- a) List out principle of units of measurement. Explain the data required for preparing detailed estimate.
- b) Mention the various purposes of estimating and costing.
[3+3] (2076 Chaitra, Q.1)Part a of this question also belongs to Sections 1.2 and 1.3.
- What is an estimating? What are the purposes of estimating? Mention various data which are required for preparing detailed estimate. [1+3+2] (2076 Ashwin, Q.1)
The third part of this question also belongs to Section 1.3.
- State, why estimated cost is necessary in construction work. Describe various data required to prepare an estimate. [3+3] (2075 Chaitra, Q.1)
The second part of this question also belongs to Section 1.3.
- Enlist the purposes of preparing an estimate of quantities of work and its cost. [4] (2075 Ashwin, Q.1)
- a) Mention the various purposes of Estimating.
- b) Write the units of measurement and payment for the following items of work:
- (i) Surface excavation
- (ii) Brick work in well steining
- (iii) Lightening conductor
- (iv) Cornice
[4+4] (2074 Ashwin, Q.1)Part b of this question also belongs to Section 1.2.
- Describe the term estimate. State the necessity of estimated cost in construction work. Mention the various requirements for preparing detailed estimate. [2+2+2] (2073 Shrawan, Q.1(a))
The third part of this question also belongs to Section 1.3.
- a) What are the purposes of Estimating and Costing? Explain the data required for Estimating.
- b) Explain in short the various methods of taking quantities in building works.
[3+5+4] (2070 Chaitra, Q.1)The data part of a also belongs to Section 1.3; part b belongs to Chapter 2.
- What is an estimate? What is meant by quantity survey? Distinguish between estimated cost and actual cost. [3] (2067 Ashadh, Q.1(a))
- a) What are the purposes of estimating? ‘An estimate is never the actual cost of the work’, justify your answer.
- b) What are the different types of estimates? How do they differ from each other?
[5+5] (2066 Bhadra, Q.1)Part b of this question also belongs to Chapter 3.
- a) What is an estimate, why it should be prepared before construction work? What are the requirements of estimating?
- b) Under what circumstances different types of estimate is prepared? Describe each of them with conditional examples.
[5+5] (2065 Shrawan, Q.1)Part b of this question also belongs to Chapter 3.