← Summary Index Full Chapter →
Chapter 6 — Summary

Spatial Analysis (Vector GIS)

06
6 Teaching Hours 10 Marks
18+Times Asked
~90Total Marks
5Topics
HighPriority

1 Geoprocessing Tools

2 Key Comparisons

AspectClipIntersect
GeometryInput features cut by clip boundaryOverlapping geometry of both layers
AttributesInput layer onlyBoth layers combined
AnalogyCookie cutterOverlap finder
AspectMergeDissolve
InputMultiple datasetsSingle dataset
ActionAppends features togetherRemoves internal boundaries
ResultMore featuresFewer, larger features

3 Intersection = Union + Clip

Conceptually: Intersect gives you the overlap area with combined attributes. This is equivalent to first performing Union (combine everything) and then clipping to the overlap zone.

4 Site Selection Workflow

  1. Define criteria (e.g., within 500 m of road, slope <10°, land use = agriculture).
  2. Buffer relevant features (roads, rivers, facilities).
  3. Overlay/intersect all constraint layers.
  4. Query: select areas satisfying all criteria simultaneously.
  5. Rank or score remaining candidates.

5 Data Management vs Spatial Analysis

Q Past Exam Questions
+Explain vector geoprocessing tools with diagrams. (Every exam 2071–2082, 6–10 marks)

Buffer, Clip, Intersect, Union, Merge, Dissolve, Erase. Draw before/after diagrams for each. Show attributes in output.

+Compare Clip and Intersect. Compare Merge and Dissolve. (2074, 2076, 2079, 2081)

Clip: geometry from input, attributes from input only. Intersect: overlap geometry, attributes from both. Merge: combines datasets. Dissolve: removes internal boundaries. Use comparison tables.

+Explain site selection using vector overlay analysis. (2073, 2075, 2078, 2080)

Define criteria, buffer, overlay, query, rank. Show a practical example: hospital site selection with road proximity, land use, slope constraints.

+How is Intersection equivalent to Union + Clip? (2074 Magh)

Union combines all features and splits at boundaries. Clipping the union result to the overlap area yields the same as Intersect. Draw Venn diagram.

+Distinguish data management operations from spatial analysis operations. (2072, 2082)

Management: organising data (merge, project, dissolve). Analysis: answering questions (buffer, overlay, proximity). Give 3 examples each.